(05-01-2018, 05:05 PM)Razor Emporium Wrote:(05-01-2018, 04:55 PM)jags009 Wrote:(05-01-2018, 03:47 PM)linuxguile Wrote: I assumed that to mean that people could still join the group buy until the 17th. But since we are at maximum discount it doesn't seem necessary to wait until then to process the orders of those that are willing, unless there is a logistical issue that Matt needs to work out.
May be this will help Matt to ascertain the exact count by then. Also it would be more smoother a transaction to ship everyone's razor at the same time once the list has been frozen.
Sent from my iPhone using Tapatalk
Exactly. This is a group buy. The razors will be assembled and shipped as a group. We will not be shipping anything until the buying period is completed.
Thank you all!
Matt
Sent from my iPhone using Tapatalk
Matt, are we allowed to go ahead and pay the amount due in the group Buy even though they won’t ship until after the 17th?
Sent from my iPhone using Tapatalk
(05-01-2018, 05:05 PM)Razor Emporium Wrote: Exactly. This is a group buy. The razors will be assembled and shipped as a group. We will not be shipping anything until the buying period is completed.Thank you for the clarification Matt, and this amazing opportunity!
Thank you all!
Matt
Sent from my iPhone using Tapatalk
I was having a PM with a member about the number of Parts on this razor.
I understand that many people feel this razor is expensive. And yes $250 is a lot for a razor (hence the group buy!)
But also please keep in mind that there are 8 machined parts and 2 springs needed to make this work.
Each one is made on a CNC lathe or mill. We are not doing any casting or metal injection molding or forging. Perhaps we will look Into some of these technologies down the road to bring cost down.
But for those interested here is an exploded view of the Ambassador. Please excuse the stains on my work mat.
Thx
Sent from my iPhone using Tapatalk
I understand that many people feel this razor is expensive. And yes $250 is a lot for a razor (hence the group buy!)
But also please keep in mind that there are 8 machined parts and 2 springs needed to make this work.
Each one is made on a CNC lathe or mill. We are not doing any casting or metal injection molding or forging. Perhaps we will look Into some of these technologies down the road to bring cost down.
But for those interested here is an exploded view of the Ambassador. Please excuse the stains on my work mat.
Thx
Sent from my iPhone using Tapatalk
(05-01-2018, 05:19 PM)Razor Emporium Wrote: I was having a PM with a member about the number of Parts on this razor.
I understand that many people feel this razor is expensive. And yes $250 is a lot for a razor (hence the group buy!)
But also please keep in mind that there are 8 machined parts and 2 springs needed to make this work.
Each one is made on a CNC lathe or mill. We are not doing any casting or metal injection molding or forging. Perhaps we will look Into some of these technologies down the road to bring cost down.
But for those interested here is an exploded view of the Ambassador. Please excuse the stains on my work mat.
Thx
Sent from my iPhone using Tapatalk
Very cool Matt!!
Sent from my iPhone using Tapatalk
(05-01-2018, 03:47 PM)linuxguile Wrote:(05-01-2018, 03:28 PM)GlazedBoker Wrote:(05-01-2018, 03:20 PM)linuxguile Wrote: So now that we are at maximum discount, can we process our orders ? Or do we have to wait until the 17th ?
Matt Razor Emporium stated in an earlier post that it will continue for the 3 full weeks, that is until the 17th of May. Refer to post #134.
I assumed that to mean that people could still join the group buy until the 17th. But since we are at maximum discount it doesn't seem necessary to wait until then to process the orders of those that are willing, unless there is a logistical issue that Matt needs to work out.
That I can't answer my friend. Maybe perhaps to allow manufacturing/qc or perhaps to give time to those that pledged to have those funds available? I don't have an issue with waiting until the pledge date is made. I mean it's only 2 weeks and 2 days away from finalizing. That's just me though.....
(This post was last modified: 05-01-2018, 05:39 PM by linuxguile.)
(05-01-2018, 05:25 PM)GlazedBoker Wrote:For some reason I am anticipating this buy more then anything else I've purchased this year. I will try to be patient though!(05-01-2018, 03:47 PM)linuxguile Wrote:(05-01-2018, 03:28 PM)GlazedBoker Wrote: Matt Razor Emporium stated in an earlier post that it will continue for the 3 full weeks, that is until the 17th of May. Refer to post #134.
I assumed that to mean that people could still join the group buy until the 17th. But since we are at maximum discount it doesn't seem necessary to wait until then to process the orders of those that are willing, unless there is a logistical issue that Matt needs to work out.
That I can't answer my friend. Maybe perhaps to allow manufacturing/qc or perhaps to give time to those that pledged to have those funds available? I don't have an issue with waiting until the pledge date is made. I mean it's only 2 weeks and 2 days away from finalizing. That's just me though.....
Users browsing this thread: 1 Guest(s)