This is the "loose" set up for the week!
Karve Overlander
Personna Comfort Coated blade
Cashmere knot
MacDuff's Aspen Parkland
Today I used the aluminum OL, as I haven't had it out lately. As I was finishing up, there is loud knocking from the first-floor front door, and my phone starts ringing. Today we are getting the boiler replaced, and the guys are like 45 minutes early! Which is great but I was still in my sweatpants, and thankfully done with the shave. So today or tomorrow we should have the new boiler in place. Lots of work (and greenbacks!) though, as there are new building codes so the venting to the outside done in 2008/2009 is no longer up to snuff, so more holes to be drilled. We have high hopes that all of our issues with the boiler we started with will be a thing of the past now.
And today is perfect for all the construction noise, as my wife is gone for most of the day to the infusion clinic and I can get my continuing education done in order to renew my license to count by fives!!
Hope you all survive ugly Monday!
- Eric
Put your message in a modem,
And throw it in the Cyber Sea
--Rush, "Virtuality"
Overloader of brushes, Overlander fanboy, Schickhead, and a GEM in the rough!